Boroondara

Housing target: 4,900 homes/year
Total housing capacity: 922,600
Land to build new housing: 1,638 MCGs

More homes in Boroondara

The answer to the housing supply shortage will not be found in a handful of designated activity centres and precincts. Boroondara needs to do its bit by delivering beautiful mid-rise homes near every one of its public transit stops.

Through broad transit-oriented upzoning and development, Boroondara can deliver housing abundance and provide more housing choices to all current and future residents across the entirety of the city. This will fulfil the original goal of Plan Melbourne creating a vast array of 20-minute neighbourhoods, rather than a small number of scattered activity centres.

In Boroondara missing middle upzoning will have the following effect:

Height Number of lots upzoned
6 storeys 39,707
4 storeys 919
3 storeys 11,930
Total 52,556

Broad upzoning is needed across existing suburbs so that there is more land available to build homes for our children to live in. If only a few select areas are rezoned, then developers will be able to buy up that land and withhold supply. Broad upzoning of land across inner-Melbourne removes any power developers may have to speculate, and lowers housing costs for all.

Housing targets

Even though there are 922,600 total possible units that could be built in Boroondara, it’s impossible for them to be built all at once. It is also not reasonable to assume that all possible units will ever be built, which is why excess zoned capacity is important.

For each lot in Boroondara, we calculated whether it would be profitable to build housing under upzoning. We estimate that there are 874,000 viable units that could be built in Boroondara.

Based off our data, in order to contribute its fair share to the the statewide target of 80,000 new homes per year, Boroondara must build 4,900 units per year.1

1 This target should be fulfilled in addition to any construction taking place as a result of any further up-zoning, such as for Suburban Rail Loop Precincts.

Planning barriers

Boroondara has been building some housing, but it is still barely keeping up with the average for Melbourne. While there has been some housing construction, the total number of homes is struggling to keep up with Melbourne’s evolving housing needs.

The biggest thing holding back Boroondara is restrictive zoning. Here is the current zoning map for Boroondara:

As a result of this restrictive zoning, Boroondara is not building enough homes to keep up with Melbourne’s growth:

Increasing zoned capacity in Boroondara by 16x, with a focus on density around transport hubs, will enable more homes to be built where people want to live.

Heritage should not be a barrier to housing abundance

Of the 874,000 potentially profitable apartments that could be built in Boroondara, 32% of these potential future homes are on lots subject to heritage controls.

If heritage and neighbourhood character protections in Boroondara are too far-reaching, it could potentially affect Boroondara’s ability to meet its housing targets.

We have outlined potential remedies for this earlier in the report.

Sketch by Archimarathon Studio
Sketch by Archimarathon Studio

Return to LGA list